
The base pieces (made from 4" ice)
We cut all of the pieces for the dispenser on the
CNC
All of the fuses are done with Aluminum |

The base pieces frozen together |

Turn upside down & add the footer |

This photo shows the footer frozen on |

Turn back right side up |

This photo shows the first of 3 top levels |

1st Top level frozen on |

This photo shows the Second of 3 top levels |

Second top level frozen on |

This photo shows the Third of 3 top levels |

Third top level frozen on |

Slide the tubing onto the Tap |

Cut the tube at an angle |

It should look like this |
 Heat up threaded nipple |

Burn into the center of the bowl with the hot nipple
On the inside of the bowl, place rubber o ring over the
threaded nipple. |

Place a washer over the threaded nipple
on the outside of the bowl |
 Tighten 2 nuts (1 on the inside & 1 on the outside) |

Slide the tube up into the L shaped tunnel |

Trim the tube as low as possible |

Place the bowl into the top of the sculpture, make sure the threaded
nipple goes down into the tube. (twist the bowl as you insert the
nipple into the tube) |

Finished beverage dispenser, after sanding & detailing.
Click here for Beverage dispenser
Kits |